WWTP Pump Replacement - 30% Design
Description: Roseburg Urban Sanitary Authority (RUSA) is accepting electronic proposals from qualified licenced engineering firms to provide professional engineering services through the development of a 30% (preliminary) design for the replacement of existing pumps at the Wastewater Treatment Plant (WWTP) including associated asessments and conceptional improvements to supporting infrastructure.
A mandatory hybrid (in-person and virtual) Preproposal Conference meeting will be conducted June 29, 2026, at 1:30 PM, local time.
Those wishing to show up in-person, the meeting will be located at 1297 N.E. Grandview Drive, Roseburg, OR 97470.
Microsoft Teams Meeting Link:
Microsoft Teams meeting
Join: https://teams.microsoft.com/meet/250504355003287?p=OeyN5AElFtkAK9ALzZ
Meeting ID: 250 504 355 003 287
Passcode: WT7nF2Z5
Only Proposers who have representatives at the meeting (either in-person or virtually) will be allowed to propose. RUSA will document all attendees and issue an Addendum with the list after the meeting.
An optional site visit of the Waste Water Treatment Plant will follow the same day, right after the Mandatory Pre-preproposal meeting. This optional site visit will be in-person only.
Proposals are due July 21, 2026 at 2:00 PM
RFP Documents - https://bidlocker.us/a/rusa/BidLocker
